So, Eda was also hiatused in September, and AC was a bit minimal in Oct, before the November miss. I'm sensitive things have been tough and want to accommodate, but I think it'd have to mean something like 1.5 x AC in both Dec and Jan for a reclaim now, given everything. That'd mean either 8 log comments or 15 network comments in Dec, and the same in Jan. Would that be feasible?
no subject